Description

Nottepox C455 is a two-component epoxy paint designed for industrial floors, with smooth surface finish, easy to apply, non-slip surface can be obtained as a top coat.

Usage Areas

• On concrete and cement based surfaces,
• In warehouses, production areas, shopping malls
• As a top coat paint material in car parks.

Characteristics

• It has high mechanical strength.
• It is liquid impermeable in certain proportions.
• Glossy surface finish.
• Easy to apply & clean.
• It can be produced in the desired RAL color.

Application Method

• Clean and remove substances such as oil, wax, grease, and water repellents from the surface using a dust floor milling machine or by lifting off any loose parts.
• The new concrete should be at least 28 days old.
• Repair cracks and damaged areas with suitable products like Nottepox R555.
• Prior to application, prime the surface with epoxy-based primers suitable for the purpose.
• Before the primer layer, roughen the surface using appropriate mechanical methods.

• Component A and component B are provided in separate packages with predetermined mixture ratios.
• Component B is fully emptied into component A and mixed together.
• The mixing should be done with a mixer at a speed of 300 rpm. It is a two-component product and should be prepared at the specified mixture rate according to the amount needed, considering the mixture’s lifespan.
• To ensure a homogeneous mixture, the product temperature should not be lower than 15°C.
• Component A should be mixed with a mechanical stirrer, and the hardener (component B) should be added, adhering to the mixture ratio.
• Components A and B should be mixed with a mechanical mixer for a minimum of 3 minutes until a homogeneous consistency is achieved.
• After preparation, the mixture should be allowed to rest for 20 minutes before application on the surface.

• If the product is to be used directly on the floor as a coating material, appropriate epoxy based primers should be used before application.
• There is no need to apply primer again if it is applied on epoxy topcoat. It is applied in two layers and the second coat should be applied within 24 hours.

• After application, protect the surface from external factors for a minimum of 24 hours. Allow controlled and light pedestrian traffic after 2 days and vehicle traffic after 7 days.
• Ensure the relative humidity of the air is below 80% and ground humidity is below 2%. Maintain an application temperature between +10°C and +30°C.
• Note that the product is not suitable for open-space applications.

Consumption

0.250 – 0.500 kg/m²

Packaging and Storage

21 kg Tin (set: Component A: 18 kg + Component B: 3 kg).
Shelf life when stored in its original packaging at +10°C / +30°C in dry, protected and ventilated environments, protected from sun, rain and frost, is 12 months from the date of manufacture.

Safety Precautions

During application and mixing, contact of the material with the skin and eyes should be prevented, and in case of contact, it should be washed with plenty of water. In case of contact with eyes, they should be washed immediately with plenty of water and medical assistance should be obtained. Gloves, protective clothing, mask/goggles should be used during use.

Technical Data

Property Value
Density (gr/cm³) 1.25
Container life at 25°C (minutes) 20
Initial Curing 24 hours
Final Curing 7 days

The above values are given at +20°C and for 50% relative humidity. High temperatures shorten the time, low temperatures prolong the time.