Nottefix

Nottefix 100 CORUNT

Description

It is a wear-resistant, powder surface hardener consisting of a mixture of special type cement, high-quality corrugated aggregate and performance-enhancing chemical additives applied monolithically to fresh concrete surfaces. It provides wear, impact, dusting and abrasion resistance against light, medium and heavy loads on concrete surfaces.

Usage Areas

  • Indoors and outdoors,
  • In factories, business centers, commercial warehouses,
  • On garage, parking and basement floors,
  • In mechanical workshops,
  • In power plants,
  • In shipyards and loading docks,
  • In metro stations and underground passages,
  • In parks and gardens, pedestrian paths and sidewalks,
  • On helicopters and airstrips.

Characteristics

  • It is applied monolithically to fresh concrete.
  • The abrasion strength of the concrete surface applied 100 CORUNT increases 4-6 times compared to normal concrete.
  • It is a part of the surface where it is applied, it does not wear out and does not spill.
  • It is economical and long-lasting.
  • It is ready to use. It saves significant time with its fast and easy application feature.
  • It provides resistance to wear and impact on concrete surfaces and joint edges.
  • It creates a surface that is resistant to weather conditions, freezing-thawing.
  • The surface is easier to clean, its resistance to oils is higher than normal concrete.
  • It is not oxidized.
  • It provides a high impermeability compared to concrete.

Application Method

  • If 100 CORUNT is to be applied on old concrete, C25 concrete with a thickness of at least 7.5 cm must be poured first. Use product to increase adherence and ensure adhesion between new concrete and old concrete.
  • The concrete to be applied should be wet enough to absorb the moisture needed by 100 CORUNT. The degree of wetness of the surface is extremely important. If the surface is excessively wet, 100 CORUNT concrete will be lost in its own thickness and will lose its effectiveness. If the surface is too dry, the product will not bond to the surface and the result will be negative.
  • Depending on the dimensions of the ground, 4 – 5 m wide anodes are placed as a full and empty one. Where necessary, mesh steel is placed in the anodes and the elevation process is completed. In order for the 100 CORUNT to be optimally spread on the surface, the sprinkling process must be carried out from both sides of the anodes.
  • The concrete is jigger after casting, and it is ensured to be placed well with the application of vibrating jigs.
  • When the concrete reaches its setting enough to leave a footprint of maximum 2-3 mm depth when it is mounted with a foot, 1/2 of the 100 CORUNT is spread equally on the ground by sprinkling by hand or by mechanical sprinkler.
  • The material is expected to be moistened by absorbing the water of the concrete and to take a dark color. It is ensured that the color is equal on all sides of the floor. Integration is achieved by thoroughly feeding the trowel and material to the floor.
  • Some material is sprinkled on the edges of the and and dilatation joints under the most load as a strip of 8 cm and fed with trowel.
  • The remaining 1/2 of the material is scattered on the ground, moistened and expected to take a dark color and fed to the ground with a trowel.
  • When it is hard enough to walk on the surface, a steel trowel (helicopter) polish is applied.

CURING

  • Curing materials should be used for curing the concrete after application.

JOINT CUTTING

  • After pouring the concrete, joint cutting should be done within 2-3 days at the latest. After the joint filler is placed in the joint cavities, the remaining cavities should be filled with suitable products.
  • It should not be applied at temperatures below +5°C and above +35°C.
  • It should not be applied in areas that are frozen, have a risk of freezing within 24 hours or are directly exposed to the sun and wind.
  • Excessive polishing should not be done, the product should not be thrown away during application to prevent the quartz aggregate from separating from the cement.
  • Before the 100 QUARZ application, the surface should not be polished with a steel trowel or any.
  • In correct applications, the ambient humidity is between 40 – 80% relative humidity. Flowering on the surface at low relative humidity, sweating on the surface at high relative humidity, slower curing and hardening may occur and the application may need to be prolonged.

Consumption

  • For light and medium loads: 5 – 6 kg/m²
  • For heavy loads: 7 – 9 kg/m²

Packaging and Storage

  • 25 kg Kraft Bag
  • In its original packaging, when stored in ventilated, dry and protected environments at +10°C/+30°C, protected from sun, rain and frost, its shelf life is 1 year from the date of manufacture.

Safety Precautions

Gloves, protective clothing, masks/goggles should be used during mixing and application, and contact of the product with eyes, mouth and skin should be prevented. In case of contact with skin, it should be washed with plenty of water, and in case of contact with eyes and swallowing, a doctor should be consulted.

Technical Data

Technical Data Specification
Appearance Gray, red, green powder
Application Temperature -5°C to +35°C
Aggregate Hardness 9 Mohs Scale
Wear Resistance to Rotating Wheel ≤ 1 cm³ (TS EN 13892-5)
Compressive Strength ≥ 80 N/mm²
Bending Strength ≥ 10 N/mm²

Note: The above values are given at +20°C and for 50% relative humidity. High temperatures shorten the time, low temperatures prolong the time.

Application Areas

Send Message