Nottefix

Nottepox C800

Description

It is a water-based coating with two-component, low viscosity, high abrasion and chemical resistance primer and coating material that can also be applied on moist concrete.

Usage Areas

  • As a coating layer on concrete, cement or epoxy mortars after applying epoxy, polyurethane or polyurea top coatings on floors exposed to medium and heavy loads,
  • As a coating material in pharmaceutical, food, automotive, beverage industry, kitchens, hospitals, all production and storage areas.

Characteristics

  • It is water-based.
  • It fills the pores on the concrete and similar surfaces where it is applied.
  • It is an easy to use coating material after curing.
  • It is resistant to water and chemical materials.
  • It provides excellent adherence by preparing the ground for the polyurethane materials to be applied on it.

Application Method

  • The surface to be applied is cleaned from dust, rust, oil and dirt with a vacuum cleaner.
  • The free particles on the surface should be completely cleaned.
  • Cracks must be repaired.
  • Joints have to be repaired.
  • Defects on the surface should be repaired before application.
  • This two-component product should be prepared at the specified mixture rate, considering the mixture life and the amount to be consumed.
  • To ensure a homogeneous mixture, it is important to maintain a product temperature of at least 15°C.
  • Quickly mix Component A with a mechanical mixer, and carefully add the hardener (Component B), adhering to the specified mixture ratio.
  • Mix Components A and B together using a mechanical stirrer for a minimum of 2 minutes.
  • The prepared mixture should be used within 30 minutes of preparation to maintain its effectiveness.
  • The mixture, which is made ready for application, is applied in a way that the pores are closed by saturating the surface with the roll.
  • The application time of the new layer on top of the layer should be at least 4 hours (20°C) and at most 48 hours.
  • It is very important to apply the second coat within the above-mentioned new coat application period.
  • It reaches a complete mechanical and chemical strength in about 7 days.

Consumption

As coating material: 500 – 600 g/m²

Packaging and Storage

  • 12.5 kg Tin (Set: Component A: 10 kg + Component B: 2.5 kg).
  • In its original packaging, when stored in ventilated, dry and protected environments at +5°C / +25°C, protected from sun, rain and frost, its shelf life is 1 year from the date of manufacture.
  • Opened packages should be used within a maximum of one week if they are tightly sealed again.

Safety Precautions

Gloves, protective clothing, masks/goggles should be used during the application and contact of the product with eyes, mouth and skin should be prevented. In case of contact with skin, it should be washed with plenty of water, and in case of contact with eyes and swallowing, a doctor should be consulted.

Technical Data

Property Value
Component Ratio A+B (epoxy + hardener)
Mixing Ratio 10 A: 2.5 B
Solid matter ratio 51%
Hardness >95 SHORE A
Application temperature 15 – 35°C
Specific Gravity 1.05 g/cm³ at 20°C (±0.01)
Availability Period 30 Minutes (at 20°C, 50% RH)
Touch Dryness 6 Hours
Pedestrian Traffic 12 Hours
Final Curing 7 days
Adhesion Strength to Concrete 2.4 – 2.6 N/mm²

The above values are given at 20°C and for 50% relative humidity. High temperatures shorten the time, low temperatures prolong the time.

Application Areas

Send Message
Hello,
Can we help you?